Construction technology of PVC FLOOR

Publish Time: 2022-09-07     Origin: Site

PVC FLOOR is a new type of light-body floor decoration material that is very popular in the world today. Next, let's take a look at the construction technology of PVC FLOORs.


Here is the content list:

l Primer

l Mixing

l Laying

l Cutting

l Pasting

l Exhaust

l Welds


Primer

1. The absorbing base layer such as the concrete and cement mortar leveling layer should be sealed and primed after being diluted with water at a ratio of 1:1 with a multi-purpose interface treatment agent.

2. If the moisture content of the base layer is too high (>3%) and it needs to be constructed immediately, an epoxy interface treatment agent can be used for primer treatment, but the premise is that the moisture content of the base layer should not be greater than 8%.

3. The construction of the interface treatment agent should be uniform, and there should be no obvious liquid accumulation. After the surface of the interface treatment agent is air-dried, the next step of self-leveling construction of the PVC FLOOR can be carried out.


Mixing

1. To ensure even self-leveling stirring, a high-power, low-speed electric drill with a special stirrer must be used for stirring.

2. The amount of water added should be strictly by the water-cement ratio (please refer to the corresponding self-leveling instructions).


Laying

1. After construction, please close the site immediately, prohibit walking within 5 hours, avoid the impact of heavy objects within 10 hours, and lay the PVC FLOOR after 24 hours.

2. In winter construction, the laying of the floor should be carried out 48 hours after the self-leveling construction.

5. If the self-leveling needs to be finely ground and polished, it should be carried out after the self-leveling is dried.


Cutting

1. Use a special trimmer to cut and clean the burrs of the PVC FLOOR coil.

2. When the blocks are laid, there should be no joints between the two materials.

3. When laying the PVC FLOOR coil, the overlap of the two materials should be overlapped and cut, generally requiring an overlap of 3 cm.


Pasting

1. Select the corresponding glue and squeegee suitable for the PVC FLOOR.

2. When paving the tiles, please turn the PVC FLOOR tiles from the middle to both sides, clean the ground and the back of the floor, and then glue and paste them.


Exhaust

1. Then use 50 or 75 kg steel rollers to roll the floor evenly and trim the warped edge of the PVC FLOOR splicing in time.

2. The excess glue on the floor surface should be wiped off in time.

3. After 24 hours, slot and weld.


Welds

1. At an appropriate welding speed (to ensure that the welding rod is melted), squeeze the welding rod into the opened PVC FLOOR groove at a constant speed.

2. When the electrode is half-cooled, roughly cut off the part of the electrode higher than the floor level with an electrode trimmer or a moon cutter.

If you are interested in SPC flooring, or wood plastic flooring, you can contact us, our website is https://www.sentaifloor.cn/.


ABOUT

Since 2019, we started to develop wood veneer with SPC/Non-PVC floor (abbreviation WS floor). This kind of floor not only has wood veneer as its top layer, but also has SPC/Non-PVC core as its base core.

CONTACT INFO

  Contact person:Simon ren

  E-mail:simon@sentaigroup.com

   Mobile phone / WhatsApp:+86 17730471120

  Tel:0086-0563-6988013

  Address:NO 23 North jianshe Road,Guangde County ,Anhui Province ,China 242200

SIGN UP FOR OUR NEWSLETTER

If you want, we'll keep you updated on the latest news about products and events

Copyright © 2021 sentaifloor Co., Ltd.  Support by Leadong.